-
Task
-
Resolution: Released
-
Should have
-
None
-
5
-
CI/CD
-
Sprint #145, Sprint #146
That's a follow-up from PLANET-5443.
Tasks
- Use tags on base-fork to trigger release pipelines, so it's easier to rollback to a specific release if necessary.
- Add a rollback pipeline for production on all NRO sites and a script to be triggered on an NRO-level.
- Add a rollback script on base-fork to trigger all NRO sites rollback pipeline.
- has to be done after
-
PLANET-5409 Use the same image for staging and production
- CLOSED
- is triggered by
-
PLANET-5443 Provide a way of rolling back Staging to the previous release
- CLOSED